As the different frames were coupled together, we bound the overlapping ends with soft iron wire. The place where frames B, C, E and F came together was quite a vital point, and we took pains to make the wire binding at this place doubly strong. As soon as the L frame was in place we anchored the bridge to shore by running wires from the ends of the D frame and the ends of the G frame to stakes driven into the banks. The frames on the second tower were now similarly erected and anchored, after which we were ready to put in the center panels of the bridge.

Fig. 319. Preparing to Put an E Frame in Place.

Fig. 319. Preparing to Put an E Frame in Place.