Integral concrete curb shall be constructed as shown on contract drawings. The concrete for integral curbs shall be of the same materials and proportions as that required for Concrete Pavement Item 61. After striking off the concrete pavement, the concrete for that portion of the integral curbs above the gutter line shall be formed by the use of proper templates to the exact shape indicated on the contract drawing and immediately given a smooth finish and completed with the pavement to the point of stopping each day's work. It shall be finished in the same manner as prescribed under specifications for Concrete Combined Curb and Gutter, Item 41.

Payment. - The price bid per lineal foot shall be for shaping and finishing only, it being understood that the price bid for concrete pavement will include the external surface of the curb.