It is assumed that an assembly-room is to be built over three small shops and that it is proposed to put in rolled steel joists and fill in with concrete. For a clear span of 17ft. Tin. the least possible depth of steel joists for an assembly-room floor is 9 in., but a 10-in. by 4 1/2-in. by 30-lb. or 10-in. by 5-in. by 29-lb. section would be much better. These joists may be placed (3 ft. apart, and it would be an advantage if 3 1/2-in. by 1 1/2-in. by 6-lb. joists were placed transversely every 6 ft. between the others, connected by angle brackets and carried by 2-in. by 2-in. by 1/4-in. steel angles riveted to web of main girder joist. The concrete should be the best Portland cement to 5 sea-beach gravel, and 0 in. thick. The centring should remain undisturbed for three weeks after the concrete is put in, and in the meantime there should be no traffic over it.