I. Elements of Construction, Chapter V

4.   7/16".                6. N. side, 20'. S. side, 79' 6". E. and W. sides, 17' 7 1/2'

5.   22 1/2".                           22. 349' nearly.                37. 20 sq. yd. 7. 7349.38 sq. ft. 23. 970'.                            38. 375'.

13.   5/8.                                 24. 14" x 28" glass.          39. 55 8/27 cu. yd.

14.    17 pieces.                    25. 5" to each piece. 40. $6.91.

17.   231 cu. in.                  26.   1505.56".                    41.   $17.44.

18.    1 gal.                           31.   2976" B. M.                44.   1485".

19.   14' B. M.                    34.   2160 cu. in.                 45.   308'.

20.   250'.                            35.   1 bu.                           46.   8 lb. weights.

21.   50,244".                      36.   280'B. M.                   47.   $10.

48.   A received $6.89. B received $5.51.

50.   The latter two are the cheaper. Saved $ .62.

51.   45'.                                    53. 07 V.                             59. 10.

52.   $66.82.                              58. 10.                              60. 14.546'.

61. 2 ends 18" long x 12 1/2|" wide x 7/8" thick, 2 sides 25 1/2|" long x 12 1/2|" wide x 7/8" thick, 1 top 19|" long x 25 1/2" wide x 7/8" thick,

1  bottom 19 3/4" long x 25 1/2" wide x 7/8" thick.

62.    150'.                      64. A's pay should be raised to 11 per hour.

------.                     65. B's pay should be cut down to 7.3 per hour.

66.    18'.                        70. 14 per hour.                            74. 8.87'.

67.   26,124.2 1b.           71. V.                                               75. $97.60.

68.   74 2/3.                      72. Neither; a catch question. 76. 402'. $18.76.

69.   Lost, $1.31|. 73. 1512 cu. ft.                                77. Made $16.66. 78.   The journeyman mechanic would be 15? per hour the cheaper.

79. 2 sides 6' 2" long x 12" wide x 1" thick,

2  ends 2' 0" long x 12" wide x 1" thick, 1 top 2' 2" long x 6' 2" wide x 1" thick, 1 bottom 2' 2" long x 6' 2" wide x 1" thick.

80.   401'. 82. 25 1/3'. 84. 4".                                  86. 2470'. 88. 10 1/2'.

81.    10.]'. 83.40".         85. Four 7-lb. weights. 87. 13 1/3',         89. 37 1/3. 90. $7.15. 91. B receives $2.00. C receives $1.60.

92. 20 rafters.             93. 416'.                      94. 20.11'.                    95. 38'.

96.    His duty as foreman requires that he should report the case, also the protection of his own reputation.    A's financial loss is 1/6 of the money paid for the labor.

97.   24 1/2'. 98. 11 1/4'. 99. 17 1/2'.        100. 15'. 101. 14,000 shingles. 102. 125'. 103. $1.35.                    104. Nothing; a catch question.

105.    1946 people.              108. 21 1/3'.                          112. 31.36 1b.

106.   14'.                            110. 30 days.                     113. $24.62.

107.   10 1/3                           111. 7840 shingles.           114. 17.21'. 118.   A receives $4.80.    B receives $4.20.                    119. 000'.

120. 24 double periods.                      121. 040 ft. of rails. 2560 ft. of boards.

122.   675 people.                                  126. B paid 7 per hour.

123.   200,350 1b.                                  127. $7.20.                   128. 2516.