Excavations. Excavations should be made enough larger than the proposed foundation that the mason may have room to wield his trowel in pointing the outer joints, and for waterproofing. An extra foot of excavation upon each side will usually be required.

All foundations must be carried well below the frost line. Excavations should be made accordingly.