From the established corners on front wall measure and stake the approximate location of the other corners and drive three stakes in a triangle two or more feet outside of the wall lines, place two boards (termed batter boards) at each corner to be nailed on the stakes when the grade is established and the building leveled. (See fig. 2.)

Fig. 2. To Stake Out A Building

Fig. 2. To Stake Out A Building