This section is from the book "A Treatise On Architecture And Building Construction Vol4: Plumbing And Gas-Fitting, Heating And Ventilation, Painting And Decorating, Estimating And Calculating Quantities", by The Colliery Engineer Co. Also available from Amazon: A Treatise On Architecture And Building Construction.
75. Having estimated the cost of work required of each trade, a summary of the whole will express the total estimated cost of the building.
Excavation and filling........ | $174.16 |
Stonework............. | 1,314.41 |
Brickwork........... | 791.71 |
Carpentry.............. | 1,023.10 |
Roofing.............. | 415.58 |
Plastering.............. | 700.82 |
Joinery.............. | 1,171.47 |
Hardware.............. | 343.62 |
Heating and ventilation........... | 251.71 |
Plumbing and gas-fitting................ | 1,117.99 |
Painting........... | 425.43 |
Total cost...................... | $7,730.00 |
 